Location: St. Paul, MN
Project Scope: Automation, Controls
NAC installed a state of the art building automation system geared towards ice rink management along with maintaining energy efficiency.
Our goal was to install the latest and the very best automation system in a very limited window of time. While working with one of Minnesota’s premier ice rink installers we were able to complete this project on time with great attention to detail.
TRIA Rink, Minnesota’s shiny new practice facility, located roughly four blocks from Xcel Energy Center in the old Macy’s building.
- The official NHL-sized ice rink can seat 1,200 spectators
- The Wild will occupy both the basement and the upper-level rink
- A fifth-floor hockey rink is an unusual architectural challenge
Follow this link to read more about the Tria Rink.