Project Scope: mechanical
Location: Sioux Falls, SD
NAC completed a Phase 3 boiler design and build of a 80,000 lb per hour boiler weighing 90,000 lbs. This 3 year project included a new boiler, pump feed water system, condensing economizer and a heat recovery system. NAC implemented BIM coordination and clash detection to ensure that previous installations in the boiler room would not overlap with the new system being installed.