Project Location: Caro, MI
Scope of Work: Anhydro RO Installation, HVAC, Plumbing, Electrical and Hydronic Plumbing
This was a design intent project where NAC installed heat reclaim equipment to transfer energy from the RTO to the process piping to maintain the temperature in the process fluids. Air-to-air heat exchanger to transfer heat from the exhaust back into their make up air unit intake.