Project Scopes: Electrical, Sheet Metal, Controls, Gas Piping
Location: Ham Lake, MN
This was a design-build project, for the construction of a new three-story charter school.
The new 105,000 square foot charter school doubles the space of the school which will enable them to serve twice as many students as the original location.
NAC performed a complete installation of electrical, controls, gas piping and sheet metal in the new building. The project required NAC’s coordination with multiple trades, General Contractor, as well as the Owner’s group to ensure near seamless installation as the building was being erected.
NAC’s coordination and pre-construction helped deliver this project on budget and on schedule