Project Scope: mechanical Location: Sioux Falls, SD NAC completed a Phase 3 boiler design and build of a 80,000 lb per hour boiler weighing 90,000 lbs
HCMC O-6 ADU-Renovation
Project Scope: piping, mechanical Location: Minneapolis, MN Complete gut and remodel of 2,500 sq. ft. space. NAC put a new HVAC System including Fan
Regions Hospital
Location: St. Paul, MN Project Scope: Boiler combustion controls upgrade, gas piping This project was a boiler control system upgrade of 3 boiler syst
POET Biorefining
Project Location: Caro, MI Scope of Work: Anhydro RO Installation, HVAC, Plumbing, Electrical and Hydronic Plumbing This was a design intent project w